For any query,Contact Us

Enquiry

About Us

Established in the year 2016, Millan Deep Construction stands as a hallmark and a name of trust in the field of real-estate business. Shree Millan Deep pioneered these endearing ventures with a dream of providing reasonable reality spaces to its customers and investors to build their homes in leading and most coveted locations of Patna . Continuing the legacy of trust and quality, Millan Deep Construction has embarked on yet another mission to serve the people with residential & commercial architectural masterpieces. Milan Deep Construction delivers world-class engineering & construction services. We are pioneers in the Indian infrastructure industry. Continuing our legacy of innovation, we achieve new milestones with every endeavour. is responsible for landmark projects that have defined the countrys progress. Surging ahead with presence in multiple sectors and involvement in revolutionary projects, we are creating opportunities for everyone. Milan Group has a strong commitment towards the safety of the people it interacts and has dealings with and, hence, we take extreme precaution with every piece of infrastructure we build. We believe in possibilities. Every Milan Deep initiative hopes to empower the lives of the people connected to it. The progress of our people powers the progress of our company. Every accomplishment becomes a foundation for us to do better, to dream bigger, and create a better future. Our responsibility, as industry leaders, drives us to be bold and embrace tougher challenges.Watching a city grow in front of our eyes is an achievement as well as a memorable experience. Since its inception, Millans has witnessed the steps of development across Patna. While this is the smallest part of the picture, the city has been in the hemisphere of real estate development for more than two decades. Marking its presence across the urban skyline of Patna, both commercial as well as residential, The Millan aim has been to create benchmarks with consistent development in customer satisfaction and value-addition.

OverView

Rera NoTotal_ProjectArea (Sq mt)Total TowerTotal Floor SizeTotal Flat1BHK+TotalArea2BHK+TotalArea3BHK+TotalAreaTotal Open Area (Sq. Mtr.)Project Start DateProject Completion Date
BRERAP00554-1/486/R-501/2019753.261B+G+416  16 flat 9 Shop324.002018-08-232023-08-22

Tower

Block - A

Flat No. 101

Floor -1st

3BHK

Area-1265 sq. ft.

Rate -3800/- sq. ft.

Flat No. 102

Floor -1st

3BHK

Area-1135 sq. ft.

Rate -3800/- sq. ft.

Flat No. 103

Floor -1st

3BHK

Area-1290 sq. ft.

Rate -3800/- sq. ft.

Flat No. 104

Floor -1st

3BHK

Area-1285 sq. ft.

Rate -3800/- sq. ft.

Amenities

  • Additional : Parking in ground floor, additional space for guest parking.
  • CCTV.
  • Intercom.
  • Lift : Six Passenger collapsible grill gate and stainless steel cabin lift with automatic rescue device.
  • Power backup through silent generator.
  • Wi-Fi

Specification

Flooring:
Door:
Window:
2’/2’ Vitrified Tiles in Drawing / Dining / Bedrooms and kitchen, Anti skid ceramic tiles in toilet and balcony.
Hardwood Frame with flush door, both side laminated for good looks.
UPVC windows with grill and tempered glass.
Kitchen:
Toilet:
Electrical:
Granite top working platform. Stainless steel sink. Ceramic glazed tiles (12”/18”) up to 2’ above working platform.
: Anti-skid ceramic floor tiles, ceramic tiles (12”/18”) up to door level on the wall. Master bed room toilet will have wall mounted toilet seats, with water diverter shower tabs.
Concealed electrification with fire resistant cables & Modular switches of ISI mark, provision for adequate light, power point, cable and telephone point in living room and master bed room.
External Façade:
Inside wall finish:
Super structure:
Exterior is superior paint finish (whether coat of 7 yrs warranty).
Inside wall with primer over wall putty.
Earthquake resistant RCC Structure.
Balcony railings:
.
.
Stainless steel railings with glass (if required) up 3.5 feet.
.
.

Plan Layout

Location Map

Location Map
MILANDEEP CONSTRUCTION PVT. LTD.

Download Brochure

Download

Payment Plan

Payment Plan 
At the time of Booking20%
Ground Floor casting10%
Four equal installment / Floor Casting40%
After Brick Work10%
After Plaster10%
After Sanitary Fitting & Electrical Work5%
At the time of Hand over5%

Bank

Total Visitor