Foundation
Structure
Civil Work
RCC pile foundation or as per the structural design.
RCC framed structure, earthquake resistant.
1" class brick work in 1:4 ratio.
Plaster
Flooring
Door
1/2" plaster in 1:6 on brick work RCC structure.
Marble / Vitrified flooring.
30mm water proof flush door and solid wood chaukhat.
Window
Toilet
Plumbing
Fully glazed / Aluminium window.
White glazed tiles upto 7ft height with wash basin, shower, WC (IWC) in common toilets and white EWC in master bedroom, concealed GL/CPVC pipe with hot and cold arrangements.
All internal GPVC pipes shall be concealed.
Kitchen
Electrical
Finish
Working platform of granite top with stainless steel sink, glazed tiles dodo upto 2ft height above working.
Concealed PVC conduit with copper wiring and standard electrical accessories, adequate light, power point ( without fan, tube and bulb ).
All internal wall and ceiling provided with wall putty and external surface by sandtex matt / super snowsem / whether coat paint.