Arcon Project Pvt. Ltd. is a professionally managed Infrastructure Development company with its head quarter at Patna (Bihar). Arcon has been established as a Construction company under the company’s act during June,2011,under the dynamic leadership of the young man Sh Arjun Singh 34 who has diversified into construction business from his family ‘s business after having thumping success in metallurgical fields under the banner of Amit Group of companies for more than 10 years manufacturing Thermo mechanically treated bars (TMT) under the brand name Trishaktri with a group turnover of over 900 crores. The core activities of the group have been manufacturing sponge iron ,steel billets,TMT bars etc.The group prides itself as one of the largest supplier of Manganese ore to Jindal and steel power Ltd. Arcon Project Pvt Ltd is being managed by a team of highly technically qualified and well experienced personnels under technical guidance of Sh Jai N Mehra a well qualified and highly experienced technocrat with post graduation in Construction management and having over 40 years of experience in the construction industry including stints in Haryana state PWD and NBCC Ltd ( A Govt of India enterprise) where from he retired as General Manager and had been heading Infrastructure Zone handling various construction packages of Mega Power Projects of National importance besides successfully executing various projects. Shiv janki Complex is the first of its kind modern day multiplex cum residential project to be situated in the heart of Muzaffarpur, Aguauria Bazzar adjacent to National highway linking North Bihar. The building is laid with Basement ground +7 floors. There is a wide parking area in the basement. This will be a one-stop fashion destination for the region with a dence mix international brands, local favorites as well as the ethnic flavour of arts & Crafts and other specialties.

OverView

Rera NoTotal_ProjectArea (Sq mt)Total TowerTotal Floor SizeTotal FlatTotal Open Area (Sq. Mtr.)Project Start DateProject Completion Date
BRERAP00033-2/48R-169/20181357.331B+G+ 7 768.552015-05-272020-03-31

Amenities

  • CCTV CAMERA: CCTV surveillance in all common area with parking.
  • ELEVATOR: Providing two lift each of 5 passengers of standard make. Otis/Kone/or equivalent.
  • GENERATOR POWER: 350 watts of electrical power to be made available for each flat, from the generator common areas lighting are also connected with generator.
  • INTERCOM FACILITIES.
  • WATER SUPPLY: 24 hours water supply from own boring, internal water supply from concealed G.I/ P.V.C. pipes.

Specification

SUPER STRUCTURE:
FLOORING:
BATHROOM:
Earthquake Resistant R.C.C. Frame Structure.
FLAT: verified tiles flooring in all area of the flat except Kitchen and Toilets which will have non-skid Ceramic Tiles.
(a) Dado Ceramic Tiles up to 7’. (b) Sanitary ware of white glazed vitreous sanitary ware of reputed make. (c) Fitting of Chromium painted C.P. fittings (d) Cistern of Acrylic / Fibreglass cistern in white color. (e) Hot water Line : Provision in Master Bathroom. (Excluding Geyser).
KITCHEN:
DOORS :
WINDOWS:
(a) working Platform of Black Granite. (b) Dado 24” high ceramic tiles above working platform. (c) Stainless Steel sink
(a) Door chowkhat of malaysian sal / equivalent hard wood. (b) Door Shutter of 32 mm thick (Century or equivalent). All door shutters shall be enamel painted.
(a) Window choukhat of Malaysian sal / equivalent hard wood. (b) Window shutter to be fully glazed and frames to be made local hardwood / soft wood – Gamhar / equivalent.
ELECTRICAL:
INTERNAL WALL:
EXTERNAL WALL:
(a) All internal wiring in copper conductors using concealed PVC conduits. (b) One TV point to be provided in drawing room & master bedroom. (c) All electrical switches and accessories of standard (ISI) make. Fan and other fixtures not included. (d) Adequate Lighting / Power points, sockets, outlets etc. provided in each flat.
All internal walls shall be finished with Birla wall putty.
Exterior wall finish with whether coat paint of reputed make.

Plan Layout

Download Brochure

Download

Payment Plan

Payment Plan 
On Application for booking10%
At the time of foundation of the said Block10%
At the time of foundation of ground floor salb of the said Block10%
At the time of foundation of First floor salb of the said Block10%
At the time of foundation of Second floor salb of the said Block10%
At the time of foundation of Third floor salb of the said Block10%
At the time of foundation of Fourth floor salb of the said Block10%
At the time of foundation of Fifth floor salb of the said Block5%
At the time of foundation of Sixth floor salb of the said Block5%
On completion of brick work & all plaster work5%
On completion of flooring work10%
On or Before possession5%