For any query,Contact Us

Enquiry

About Us

At the heart of our company is a strong commitment to provide our clients an optimum world class service distinguished by technical project management expertise. We are the leading provider of excellent customer service both in domestic and global construction and trading industry in terms of sustained growth, stability, profitability and return of equity, professional management and responsible stewardship of resources. Thank you for your interest in Sri Mateshwari Construction and we encourage you to explore our website, from the list of our projects to global achievements and to have an insight into our exceptional performance in the realms of the construction industry. As always we look forward to hearing your feedback on how we can be of service to you and your company as we seek to fulfill our mission, which is to provide Quality Construction and Building Contracting Solutions while maintaining high standards of Quality, Safety, Environment and Value Engineering for the benefit our customers, nation and society through professionalism, ethics, quality and customer service.

OverView

Rera NoTotal_ProjectArea (Sq mt)Total TowerTotal Floor SizeTotal Flat1BHK+TotalArea2BHK+TotalArea3BHK+TotalAreaTotal Open Area (Sq. Mtr.)Project Start DateProject Completion Date
BRERAP00026-4/96/R-43/20187202.793B+G+7, G+7168 421262018-01-152018-01-152021-12-31

Tower

Block - A

Flat No. 701

Floor -7th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 702

Floor -7th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 703

Floor -7th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 704

Floor -7th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 705

Floor -7th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 706

Floor -7th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 707

Floor -7th

2BHK

Rs. 4100/- Sq. Ft.

Flat No. 708

Floor -7th

2BHK

Rs. 4100/- Sq. Ft.

Flat No. 601

Floor -6th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 602

Floor -6th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 603

Floor -6th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 604

Floor -6th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 605

Floor -6th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 606

Floor -6th

3BHK

Rs. 4100/- Sq. Ft.

Flat No. 607

Floor -6th

2BHK

Rs. 4100/- Sq. Ft.

Flat No. 608

Floor -6th

2BHK

Rs. 4100/- Sq. Ft.

Amenities

  • Club House
  • Community Hall
  • Fire Fighting
  • Garden
  • Gym
  • Indoor Game
  • Intercom
  • Kids Play Area
  • Security
  • Swimming Pool

Specification

Foundation
Structural
Civil Work
R.C.C. Pile foundation or as per the structural design.
R.C.C. framed structure, earthquake resistant.
1" Class brick work in 1:5 ratio.
Plaster
Flooring
Door
1/2" Plaster in 1:6 on Brick works RCC surface.
Verified flooring.
30 mm water proof flush door and solid wood chaukhat.
Window
Toilet
Plumbing
Fully glazed/Aluminium window.
White glazed tiles up to 7 ft. height with wash basin , shower, W.C.(I.W.C.I) in master bedroom, concealed G.I/C.P.V.C. pipe with hot and cold water arrangements.
All internal C.P.V.C. pipes shall be concealed.
Kitchen
Wash Basin
Electrical
Working platform of granite top with stainless steel sink glazed tiles dado up 2 ft. height above working top.
Wash basin with plumbing connection to be provided in the dining space as well as in the toilets.
Concealed P.V.C. conduit with copper wiring and standard electrical accessories adequate light, power point (without fan, tube & buld
Finish
.
.
All Internal wall and ceiling provided with wall putty and external surface by sandtex matt / super snowcem / weather coat paint
.
.

Plan Layout

Location Map

Location Map
Sri Mateshwari Constructions, Singh Villa

Download Brochure

Download

Payment Plan

Payment Plan 
At the time of Booking10%
After Completion of Foundation20%
After Completion of Ground Floor Roof Slab10%
After Completion of First Floor Roof Slab5%
After Completion of Second Floor Roof Slab5%
After Completion of Third Floor Roof Slab5%
After Completion of Fourth Floor Roof Slab5%
After Completion of Fifth Floor Roof Slab5%
After Completion of Sixth Floor Roof Slab5%
Completion of Plaster Work10%
At the Time of completion5%
After Completion of Seventh Floor5%
Completion of Brick Work10%
Completion of Plaster Work10%
Time of Completion5%

Bank

Total Visitor