Flooring
Foundation
Structural
Marble/ Verified Flooring.
R.C.C. Pile foundation or as per the structure design.
R.C.C. framed structure, earthquake resistant.
Civil Work
Plaster
Door
1" Class brick work in 1:4 ratio.
1/2" Plaster in 1:6 on Brick works RCC surface.
30 mm water proof flush door and solid wood chaukhat.
Window
Toilet
Plumbing
Fully glazed / Aluminium window.
white glazed tile up to 7ft. height with wash basin, shower, W.C. (I.W.C.) in common toilets and white E.W.C. in master bedroom, concealed G.I./C.P.V.C. pipe with hot and cold water arrangements.
All internal G.P.V.C. Pipes shall be concealed.
Kitchen
Wash Basin
Electrical
working Platform of granite top with stainless steel sink glazed tiles dado up 2ft. height above working top.
Wash basin with plumbing connection to be provided in the dining space as well as in the toilets.
Concealed P.V.C. conduit with copper wiring and standard electrical accessories, adequate light, power point I without fan , tube & bulb)
Finish
.
.
All internal wall and ceiling provided with wall putty and external surface by sandtex matt/super snowcem/whether coat paint.
.
.